FAQ’s

Frequently Asked Questions

For commercial food production flooring the waterproofing is to be installed on the primary concrete layer. If there is a ramped screed to be installed on top of this, (if determined by manufacturers specifications), it must also be waterproofed terminating in a puddle flange which is a PVC dished collar connected to the sewer drainpipe where it penetrates the concrete floor structure at the lowest point in the primary floor.
No. There needs to be an intermediary layer of screed not less than 10mm thick. You can however install a 5mm epoxy system over the appropriate waterproofing system.
In a doorway it needs to be as high as the finished floor level. Wall areas are generally 300mm including the set down.
No. It must be one that is compatible, and part of the manufacturers approved system.
Typically, between 1 & 2 days depending on the product.
Engineered cementitious screeds are a minimum 24-48 hours depending on brand and conditions. Epoxy screeds are quicker ranging between 12-18 hours depending on atmospheric conditions (temperature). Also, an accelerator can reduce the curing time to a few hours.
In short NO. Many manufacturers of epoxy and polyurethane flooring systems will not warrant their product systems to be applied over sand/cement screeds because they are not strong enough.
Typically, the recommended maximum is 90mm and the minimum when applying over waterproofing is 10mm. Where waterproofing is not part of the equation, epoxy mortar can feather out to less than 1mm.
Yes. Depending on the requirements of the rooms purpose, a P2-P5 or higher can be achieved to match AS 4586 – 2013 & HB198:2014.
Usually after 12-18 hours depending on the ambient temperature.
No, it does have a slight smell, but it is very low VOC.
Yes. We supply simple to follow cleaning instructions.
That totally depends on how much use and care it receives. It is not uncommon for 4.5-6mm trowelled polyurethane floors to be still performing well after 12-15 years. High wear areas can be resurfaced in localised areas without the need to resurface the whole floor.
As long as the tiles are sound and with specific preparation. This can save considerable cost and down time.
The Australian Standard 4586-2013 and HB 198:2014 provide the P and R ratings for specific use areas. Epoxy/polyurethane system manufacturers are aware of these and formulate technical data so that their systems meet these requirements. Part of our service is to match your floor with the appropriate certified flooring system that meets the Australian Standard slip rating.
Yes they can, but it is best practice to install a suitable floor leveller over the tiles first.
Yes, but provided the concrete was installed utilising a plastic membrane moisture barrier under it.
Resin Granite and colour Flake finishes have a P3 slip rating which meets or exceeds the Australian Standard for office space, patios, living areas, change rooms, garage floors etc. For areas that require a higher slip rating, this is achievable by adding a transparent anti slip medium.

Very serviceable. This is why they are so popular. A walk behind or ride on
cleaning machine is more suited to large areas. For smaller areas, a vacuum cleaner
with a brush head or broom and sponge mop are all the low tech equipment required.

Yes. We have a range of holographic glitter in several shapes and sizes to enhance your floor from subtle twinkle to WOW!
Yes it can, using the correct preparation, primer and levelling compound.
This depends on product, but 30-50mm is achievable in one pour. Greater thickness can be achieved with a second pour.
Yes. There are levelling compounds formulated for this that are weather proof and trafficable.
Absolutely. But it is critical to use a levelling compound formulated for this purpose.
At least 24 hours and longer depending on type, thickness and atmospheric conditions.
Yes, with the right choice of coating or penetrating sealer.